Definitions:
  • T Toilet : A general term for a room with a toilet and sink, often used for personal hygiene.
  • ST Shower + Toilet : A Shower room primarily designed for showering, typically featuring a shower cubicle or area.
  • BT Bathroom + Toilet : A room containing a bath , toilet, and often a sink, used for bathing and personal care.
  • BST Bathroom + Shower + Toilet : A room containing a bath + Shower + toilet, and often a sink, used for bathing and personal care.
洗手間
Toilet ( T )
座廁 + 洗手盤
淋浴間
Shower + Toilet ( ST )
座廁 + 洗手盤 + 淋浴間
浴室
Bathroom + Toilet ( BT )
座廁 + 洗手盤 + 浴缸
淋浴室 Bathroom + Shower + Toilet ( BST )
座廁 + 洗手盤 + 淋浴間+ 浴缸
Bathroom Renovation Package
T Toilet
Demolition Works
  • Removal of bathroom flooring
  • Removal of old bathroom cabinet
  • Removal of bathroom tiles
  • Removal of sink and toilet
  • Waste disposal
Inspection Items
  • Electrical wiring inspection
  • Heating equipment check
  • Water pipe inspection
  • Exhaust fan check
Bathroom Renovation
  • Waterproof wall painting
  • Installation of new fixtures: sink, toilet, exhaust fan, heating
Installation of electrical switches
  • Switch x 1
  • Socket x 1
Construction Time

Estimated duration : 5 - 7 days

Renovation Budget

Price : £2.5K


ST Shower + Toilet
Demolition Works
  • Removal of bathroom flooring
  • Removal of old bathroom cabinet
  • Removal of bathroom tiles
  • Removal of sink, toilet, and shower
  • Waste disposal
Inspection Items
  • Electrical wiring inspection
  • Heating equipment check
  • Water pipe inspection
  • Exhaust fan check
Shower room Renovation
  • Waterproof wall painting
  • Installation of new fixtures: sink, toilet, shower, exhaust fan, heating
Installation of electrical switches
  • Switch x 1
  • Socket x 2
Construction Time

Estimated duration: 7 - 10 days

Renovation Budget

Price : £3K


BT Bathroom + Toilet
Demolition Works
  • Removal of bathroom flooring
  • Removal of old bathroom cabinet
  • Removal of bathroom tiles
  • Removal of sink, toilet, and bathtub
  • Waste disposal
Inspection Items
  • Electrical wiring inspection
  • Heating equipment check
  • Water pipe inspection
  • Exhaust fan check
Bathroom Renovation
  • Waterproof wall painting
  • Installation of new fixtures: sink, toilet, bathtub
Installation of Electrical Switches
  • Switch x 1
  • Socket x 2
Construction Time

Estimated duration: 10 - 14 days

Renovation Budget

Price range: £3.3K


BST Bathroom + Shower + Toilet
Demolition Works
  • Removal of bathroom flooring
  • Removal of old bathroom cabinet
  • Removal of bathroom tiles
  • Removal of sink, toilet, bathtub, and shower
  • Waste disposal
Inspection Items
  • Electrical wiring inspection
  • Heating equipment check
  • Water pipe inspection
  • Exhaust fan check
Bathroom Renovation
  • Waterproof wall painting
  • Installation of new fixtures: sink, toilet, bathtub and shower

Installation of Electrical Switches

  • Switch x 1
  • Socket x 2
Construction Time

Estimated duration: 10 - 14 days

Renovation Budget

Price range: £3.8K

Made with